Amico Dome Loaded Manifold NFPA User Manual

Browse online or download User Manual for Equipment Amico Dome Loaded Manifold NFPA. Amico Dome Loaded Manifold NFPA User Manual [en]

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - www.amico.com

Operating & Maintenance ManualAutomatic Medical Gas ManifoldDome Loaded Regulator NFPA v1.2 www.amico.com

Page 2 - Contents

GAS SERVICE IDENTIFICATIONAmico manifolds are clearly labeled for the intended gas use, with the appropriate gas identied with a label that is attach

Page 3 - www.amico.com 3

www.amico.com 11Display Functions1. Introduce power to the control cabinet. 2. Follow Cylinder Changing Procedures on the side of the cabin

Page 4 - User Responsibility

12 Amico PipelineInstallationPRECAUTIONS• Tampering with gas specic connections shall be prohibited. Do not alter, remove or modify gas specic

Page 5 - Introduction

www.amico.com 13Wall Mounting Instructions1. Remove manifold control panel from the shipping carton. If the manifold will be placed on a at

Page 6 - Description of the Manifold

14 Amico Pipeline4. Hang the manifold control panel on the mounting bracket. The top two control panel mounting bolts will slide into slots of th

Page 7

www.amico.com 15Cylinder Bank Installation Instructions Microprocessor Digital ManifoldPage: 4USER RESPONSIBILITYThe information contained in

Page 8

16 Amico PipelineTesting for LeakageThe following instructions apply for performing a leak test on the joints made during assembly and connection

Page 9

www.amico.com 17PrecautionsThe Amico Automatic Gas Manifolds are designed in accordance with the current revision of NFPA 99.There are three

Page 10 - Description of Parts

18 Amico PipelineInitial Power-Up1. Release the two latches on either side of the manifold control panel and remove the cover. 2. Verify the fol

Page 11 - Display Functions

www.amico.com 1910. Slowly open one cylinder on the right side of the manifold.11. Verify the following:• Right bank Red “Empty” LED goes

Page 12 - Installation

User Responsibility 4Introduction 5Features 5Description of the Manifold 6Shipment Details 6The Manifold Enclosure 6Header Bar Wall Support Bracke

Page 13 - Wall Mounting Instructions

20 Amico PipelineHigh pressure gas is provided to the left and right manifold bank inlets via cylinders, pigtails and header assemblies. Flow of h

Page 14

www.amico.com 21Manifold Switch OverAfter electrical power has been applied to the manifold, the side pressurized rst is designated the prim

Page 15 - USER RESPONSIBILITY

22 Amico PipelinePerformance VericationUse the following test steps to verify the manifold’s functional performance:1. Remove manifold cover.2.

Page 16 - Testing for Leakage

www.amico.com 23Performance Verication 14. Slightly depress the bleed valve on the left line regulator to create a small ow of gas through

Page 17

24 Amico PipelineBank Regulator Pressure AdjustmentThis procedure should only be performed if the bank regulator pressures are not within acceptab

Page 18 - Initial Power-Up

www.amico.com 25Should it be necessary to replace the bank regulator, it can be done while the manifold is in service. However, this should o

Page 19

26 Amico PipelineLine Regulator Pressure AdjustmentThis procedure should be performed if the line regulator pressures are not within acceptable li

Page 20 - Gas Flow Through the Manifold

www.amico.com 27Control Board Replacement If necessary, the control board replacement can be performed while the manifold is in service. Howe

Page 21 - Manifold Switch Over

28 Amico PipelineCylinder Changing ProceduresWARNING: High pressure oxygen systems must be handled with CAUTION. Spontaneous combustion may occur

Page 22 - Performance Verication

www.amico.com 29CONTROL CABINET PARTS LISTOrdering InformationThe Letters “XXX” Dene the Type of Gas:Oxygen = OXYNitrogen = NIT Medi

Page 23

Cylinder Changing Procedures 28Ordering Information 29-30Control Cabinet Part List 29Appendix A: Manifold Internal Layout 31Appendix B: Piping Sch

Page 24 - 24 Amico Pipeline

30 Amico PipelineOrdering InformationDESCRIPTION MODEL NUMBERIntermediate check valve for all gasesOperating pressure relief valve NitrogenOperati

Page 25 - Bank Regulator Replacement

www.amico.com 31Appendix AManifold Internal Layout

Page 26 - Line Regulator Replacement

32 Amico PipelineAppendix B6568743543671112VENT TOOUTSIDETOPIPELINEDISTRIBUTIONSYSTEMRIGHTBANKLEFTBANKHPLBHPRBRIGHT HAND BANKCYLINDER PRESSURELEFT

Page 27 - Control Board Replacement

www.amico.com 33Appendix CWiring Schematic Heater UnitsThe Heaters normally switch on when the temperature drops below 24°C or 75°F. If the

Page 28 - Cylinder Changing Procedures

34 Amico PipelineAppendix DElectrical Wiring DiagramAmico Medical Gas Alarm Master Alarm115 VACSupplyVoltageConnect the NO loop to the appropriate

Page 29 - Ordering Information

www.amico.com 35Appendix EControl Cabinet Wiring DiagramLineSensorLine Display BoardLeft Bank Display Board Right Bank Display Board

Page 30

36 Amico PipelineAppendix FStaggered Header Bar

Page 31 - Appendix A

www.amico.com 37Straight Header Bar SetupAppendix G

Page 32 - Appendix B

38 Amico PipelineAppendix HOptional Header Bar Setup

Page 33 - Appendix C

www.amico.com 39Standard Manifold Flow RatesAppendix I

Page 34 - Appendix D

4 Amico PipelineUser ResponsibilityThe information contained in this Installation and Maintenance Manual pertains only to the Amico Automatic Gas

Page 35 - Line Display Board

Amico Pipeline | www.amico.com 85 Fulton Way, Richmond HillOntario, L4B 2N4, CanadaToll Free Tel: 1.877.462.6426Toll Free Fax: 1.866.440.4986Tel: 90

Page 36 - Appendix F

www.amico.com 5IntroductionThe Amico Automatic Gas Manifold is a one of a kind design that provides a reliable, uninterrupted supply of gas t

Page 37 - Appendix G

6 Amico PipelineDescription of the ManifoldSHIPMENT DETAILSThe Manifold system may be shipped in more than one carton, depending on the number of

Page 38 - Appendix H

www.amico.com 7Description of PartsWhen replacement cylinders are attached to the depleted bank, the Red LED goes out and the Yellow LED illu

Page 39 - Appendix I

8 Amico PipelineLINE REGULATOR BALL VALVEQuarter-turn ball valves are located upstream and downstream of each line regulator. These valves allow f

Page 40 - 4B 2N4, Canada

www.amico.com 9 Microprocessor Digital ManifoldPage: 4USER RESPONSIBILITYThe information contained in this Installation and Maintenance Manua

Comments to this Manuals

No comments